<i id="hinwa"><em id="hinwa"></em></i>

          1. <em id="hinwa"><option id="hinwa"><em id="hinwa"></em></option></em>
          2. 欧美人与牲动交a欧美精品,欧美XXXX黑人又粗又长,亚洲高清美女一区二区三区,国产一区二区三区在线观看免费 ,三级黄色片网站,国产成人自产拍免费视频 ,精品卡通动漫亚洲AV第一页,91jiuse蝌蚪
            Hello! welcomeZhejiang Xikai Electric Co. , Ltd.
            Zhejiang Xikai Electric Co. , Ltd.

            News

            Contact
            Zhejiang Xikai Electric Co. , Ltd.
            Mailbox:wzxikai@wzxikai.com
            Tel:+86 577 61666 016
            Address:No.271, Weishiqi Road, Yueqing Economic Development Insuatrial Zone, Yueqing, Zhejiang.
            current position:Home>news

            News

            The 500 Kv Shaoling substation is the first of its kind in China
            release time:2020-03-31
            On April 9, the Shaoling Camera modulation project was put into operation at the 500 Kv Shaoling substation in Luohe, Henan Province. This project is the first 500 KV transformer substation installation project in China, which is of great significance to ensure the safe and stable operation of the UHVDC project. The commissioning of the Shaoling condenser project will effectively solve the problem of reactive power and voltage stability caused by the large-scale connection of uhv trans-regional DC transmission and scenic new energy to the power grid, it is of great significance for Henan to absorb foreign electricity on a larger scale, absorb clean energy on a larger scale and speed up energy transformation and development. The condenser is a synchronous motor that can maintain the stability of reactive power and voltage by absorbing and outputting power to solve the problem of dynamic reactive power shortage caused by the increase of High-voltage direct current#Back to back capacity and the large-scale access of new energy sources, so as to ensure the safe and stable operation of the power grid. A total investment of more than 300 million yuan has been invested in the Shaoling Camera Adjustment Project in Luohe. Two 300-megaton Synchronous condenser units have been installed. The latest technology of the Energy Internet has been adopted to digitize equipment monitoring, automate unit operation and maintenance, and remotely control dispatch. The commissioning of the project can effectively solve the problem of reactive power and voltage stability caused by UHV TRANS-REGIONAL DC transmission and large-scale access to the power grid by scenic new energy sources, it will help the Henan Power Grid to absorb foreign electricity on a larger scale and absorb clean energy on a larger scale, accelerate the transformation and development of energy, and further enhance the ability of the Henan Power Grid to ensure security and optimize the allocation of resources, it is of great significance for the safe and stable operation of the main power grid in Henan Province and the restoration of normal production order during the epidemic prevention and control period. The Shaoling Camera modulation project in Luohe also has certain economic and environmental benefits. "taking the 800 Kv Tianzhong DC already in operation as an example, the Shao Ling condenser project can effectively increase the transmission capacity without increasing investment after it is put into operation, " said Shen Hui, head of the trial Operation Group of the Shao Ling Condenser project in Luohe. Since mid-february, the state power company of Henan Province, which is the owner of the project, has organized the relevant units under its ownership to strictly implement the measures for the prevention and control of the epidemic situation and promptly start the project to resume work, do a solid job of equipment lean tracking, project professional acceptance, network-related testing and other preparatory work. In the process of implementation, the general contractor Nanrui group successfully completed the protection system debugging, telecontrol up-feed, excitation switch, fast restart, no-load characteristics, synchronous grid-connected and other tests. The test results show that all parameters, performance and indexes meet the requirements of the design scheme, and the transient Operation Index and overload capacity are excellent. Earlier, the UHVDC converter stations in Jarud Banner, Jiuquan and Ximeng have been completed, effectively enhancing the stability of the UHV power grid and power supply capacity. The commissioning of Shaoling condenser project can provide a model for the installation of 500kv substations.

            主站蜘蛛池模板: 97久久久久人妻精品专区| 亚洲色偷偷AV男人的天堂| 国产91在线|日本| 精品国产一区二区三区蜜殿| 色综合天天综合网中文| 精品亚洲国产成人av在线| 久久婷婷激情综合色综合俺也去| 久久综合九色综合精品| 91小视频在线播放| AV无码中文| 精品一区二区亚洲国产| 毛片一级精油按摩无码| 嫩草国产福利视频一区二区| 亚洲色大成网站www永久男同| 中文日韩在线一区二区| 国产农村妇女高潮大叫| 可播放的亚洲男同网站| 亚洲精品欧美二区三区中文字幕 | AV区无码字幕中文色| 国产精品激情av在线播放| 又爽又大又光又色的午夜视频| 国产一区二区三区导航| 久久国产影院| 饥渴的熟妇张开腿呻吟视频| 国模欢欢高清炮交视频| 亚洲成a人片77777在线播放| 激情97| 蜜臀久久99精品久久久久久牛牛| 日韩视频中文字幕精品偷拍| 亚洲自拍偷拍中文字幕色| 亚洲最大有声小说AV网| 99人妻碰碰碰久久久久禁片| 高台县| 在线精品亚洲观看不卡欧| 五月综合网亚洲乱妇久久| 中出21p| 免费无遮挡无码视频在线观看| 韩国无码AV片午夜福利| 中文字幕亚洲精品在线观看| 日韩av综合| 人妻一区二区三区久久|